MISO request J949

MISO queue ID J949

Queue request J949 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Coles County, IL, according to Berkeley Lab’s queue data file. The filing names Kansas Substation Bus #3 as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 31, 2020.

Queue IDJ949
Project nameNot reported
Status (as published)Operational
SubstationKansas Substation Bus #3
Point of interconnectionKansas Substation 138kV Bus #3
CountyColes
StateIL
Voltage138 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2020-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Coles, IL: 13 requests in the MISO queue, 6 active totaling 1,186.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN TRANSMISSION COMPANY OF ILLINOIS
ClusterDPP-2017-AUG Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2017-06-16
Interconnection agreement date2019-12-10
Operational date2020-10-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.