Coles, IL interconnection queue

6 active projects totaling 1,186.3 MW in the MISO queue, plus 7 with terminal status (shown grayed).

6active projects
1,186.3active MW
13total filed
Queue IDProjectkVMWResourceStatus
G661 Not reported 138 726 Coal Withdrawn
J1757 Not reported 345 300 Wind Withdrawn
J2128 Not reported 345 300 Hybrid Active
J2504 Not reported 138 300 Battery Withdrawn
J3012 Not reported n/r 287 Solar Active
J973 Not reported 345 250 Wind Withdrawn
J3391 Not reported 345 200.3 Wind Active
J949 Not reported 138 200 Solar Operational
J2393 Not reported 138 164 Solar Withdrawn
J1974 Not reported n/r 160 Solar Withdrawn
J3968 Not reported n/r 100 Battery Active
J1232 Not reported 138 99 Solar Active
J1975 Not reported n/r 40 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.