MISO request J859

MISO queue ID J859

Queue request J859 was listed in the MISO interconnection queue at the end of 2025 as a 149.9 MW solar project in Cass County, IL, according to Berkeley Lab’s queue data file. The filing names Frederick North - Meredosia East Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2022.

Queue IDJ859
Project nameNot reported
Status (as published)Active
SubstationFrederick North - Meredosia East Line
Point of interconnectionFrederick North - Meredosia East 138kV Line
CountyCass
StateIL
Voltage138 kV
Capacity149.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2022-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cass, IL: 2 requests in the MISO queue, 1 active totaling 149.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2017-AUG Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Under Construction
Queue date2017-06-16
Interconnection agreement date2020-01-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.