Cass, IL interconnection queue
1 active project totaling 149.9 MW in the MISO queue, plus 1 with terminal status (shown grayed).
1active projects
149.9active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G909 | Not reported | 138 | 150 | Wind | Withdrawn |
| J859 | Not reported | 138 | 149.9 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.