Substation Scout

MISO request J853

MISO queue ID J853

Queue request J853 was listed in the MISO interconnection queue at the end of 2025 as a 149 MW solar project in White County, IL, according to Berkeley Lab’s queue data file. The filing names Norris City North Substation Bus as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 28, 2021.

Queue IDJ853
Project nameNot reported
Status (as published)Operational
SubstationNorris City North Substation Bus
Point of interconnectionNorris City North Substation 138kV Bus
CountyWhite
StateIL
Voltage138 kV
Capacity149 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2021-05-28
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

White, IL: 3 requests in the MISO queue, 3 active totaling 549 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2017-AUG Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2017-06-16
Interconnection agreement date2019-12-20
Operational date2021-05-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first