Substation Scout

White, IL interconnection queue

3 active projects totaling 549 MW in the MISO queue.

3active projects
549active MW
3total filed
Queue IDProjectkVMWResourceStatus
J800 Not reported 138 250 Solar Active
J2797 Not reported n/r 150 Hybrid Active
J853 Not reported 138 149 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first