Queue request J830 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in Madison County, MS, according to Berkeley Lab’s queue data file. The filing names Canton South to Hoy Road Line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 15, 2021.

Queue IDJ830
Project nameNot reported
Status (as published)Operational
SubstationCanton South to Hoy Road Line
Point of interconnectionCanton South to Hoy Road 230 kV Line
CountyMadison
StateMS
Voltage230 kV
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2021-11-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Madison, MS: 15 requests in the MISO queue, 7 active totaling 977 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEntergy
ClusterDPP-2017-AUG South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2017-06-16
Interconnection agreement date2020-03-05
Operational date2021-11-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first