MISO request J813
MISO queue ID J813
Queue request J813 was listed in the MISO interconnection queue at the end of 2025 as a 275 MW solar project in Clay County, IL, according to Berkeley Lab’s queue data file. The filing names Louisville South Substation Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 29, 2021.
| Queue ID | J813 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Louisville South Substation Line |
| Point of interconnection | Louisville South Substation 138kV Line |
| County | Clay |
| State | IL |
| Voltage | 138 kV |
| Capacity | 275 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2021-10-29 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Clay, IL: 11 requests in the MISO queue, 8 active totaling 1,500 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Cluster | DPP-2017-AUG Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: Under Construction |
| Queue date | 2017-06-16 |
| Interconnection agreement date | 2019-12-16 |
| Operational date | 2024-11-21 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.