Clay, IL interconnection queue
8 active projects totaling 1,500 MW in the MISO queue, plus 3 with terminal status (shown grayed).
8active projects
1,500active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J813 | Not reported | 138 | 275 | Solar | Active |
| J2033 | Not reported | 345 | 200 | Solar | Active |
| J2379 | Not reported | n/r | 200 | Battery | Active |
| J3811 | Not reported | 138 | 200 | Solar | Active |
| J3880 | Not reported | 345 | 200 | Solar | Active |
| J3881 | Not reported | 345 | 200 | Battery | Active |
| J991 | Not reported | 345 | 200 | Solar | Withdrawn |
| J3389 | Not reported | 138 | 150 | Solar | Withdrawn |
| J1679 | Not reported | 345 | 125 | Solar | Active |
| J2125 | Not reported | 345 | 100 | Solar | Withdrawn |
| J2197 | Not reported | n/r | 100 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.