MISO request J805
MISO queue ID J805
Queue request J805 was listed in the MISO interconnection queue at the end of 2025 as a 199 MW solar project in Shelby County, IN, according to Berkeley Lab’s queue data file. The filing names Gwynneville Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2022.
| Queue ID | J805 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Gwynneville Substation |
| Point of interconnection | Gwynneville 345kV Substation |
| County | Shelby |
| State | IN |
| Voltage | 345 kV |
| Capacity | 199 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2022-05-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Gwynneville Substation substation: 4 requests in the MISO queue, 1 active totaling 199 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J259 | Not reported | 1,065 | Gas | Withdrawn |
| J1152 | Not reported | 200 | Solar | Withdrawn |
| J1704 | Not reported | 50 | Battery | Withdrawn |
Shelby, IN: 8 requests in the MISO queue, 1 active totaling 199 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Corporation |
|---|---|
| Cluster | DPP-2017-AUG Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: Under Construction |
| Queue date | 2017-06-16 |
| Interconnection agreement date | 2020-05-08 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.