Substation Scout

Shelby, IN interconnection queue

1 active project totaling 199 MW in the MISO queue, plus 7 with terminal status (shown grayed).

1active projects
199active MW
8total filed
Queue IDProjectkVMWResourceStatus
J259 Not reported 345 1,065 Gas Withdrawn
J250 Not reported 345 999 Gas Withdrawn
G088 Not reported n/r 350 Other Withdrawn
J1756 Not reported 345 309 Hybrid Withdrawn
J805 Not reported 345 199 Solar Active
J1829 Not reported 230 180 Solar Withdrawn
J1704 Not reported 345 50 Battery Withdrawn
J1699 Not reported 69 43 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.