MISO queue ID J794

Queue request J794 was listed in the MISO interconnection queue at the end of 2025 as a 12.5 MW wind project in Gratiot County, MI, according to Berkeley Lab’s queue data file. The filing names J589 Substation (Regal - Summerton Line) as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 26, 2018.

Queue IDJ794
Project nameNot reported
Status (as published)Operational
SubstationJ589 Substation (Regal - Summerton Line)
Point of interconnectionJ589 138kV Substation (Regal - Summerton 138kV Line)
CountyGratiot
StateMI
Voltage138 kV
Capacity12.5 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2018-10-26
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Gratiot, MI: 25 requests in the MISO queue, 14 active totaling 1,723.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2017-AUG East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2017-06-16
Interconnection agreement date2020-06-18
Operational date2018-10-26

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first