MISO request J757

MISO queue ID J757

Queue request J757 was listed in the MISO interconnection queue at the end of 2025 as a 303.6 MW wind project in Morgan County, IL, according to Berkeley Lab’s queue data file. The filing names Austin-Meredosia line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 31, 2021.

Queue IDJ757
Project nameNot reported
Status (as published)Operational
SubstationAustin-Meredosia line
Point of interconnectionAustin-Meredosia 345kV line
CountyMorgan
StateIL
Voltage345 kV
Capacity303.6 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2021-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Morgan, IL: 11 requests in the MISO queue, 5 active totaling 823.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN TRANSMISSION COMPANY OF ILLINOIS
ClusterDPP-2017-FEB Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2016-11-14
Interconnection agreement date2019-05-31
Operational date2021-10-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.