Morgan, IL interconnection queue

5 active projects totaling 823.6 MW in the MISO queue, plus 6 with terminal status (shown grayed).

5active projects
823.6active MW
11total filed
Queue IDProjectkVMWResourceStatus
J757 Not reported 345 303.6 Wind Operational
J3360 Not reported n/r 250 Battery Withdrawn
J1289 Not reported 345 200 Wind Active
J239 Not reported n/r 200 Coal Withdrawn
J835 Not reported 345 200 Wind Withdrawn
G908 Not reported 138 150 Wind Withdrawn
J750 Not reported 138 150 Wind Active
J641 Not reported 138 140 Solar Active
J3684 Not reported 138 100 Solar Withdrawn
J2908 Not reported n/r 30 Solar Active
J318 Not reported n/r 30 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.