Queue request J589 was listed in the MISO interconnection queue at the end of 2025 as a 148.8 MW wind project in Gratiot County, MI, according to Berkeley Lab’s queue data file. The filing names Regal-Summerton line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 10, 2018.

Queue IDJ589
Project nameNot reported
Status (as published)Operational
SubstationRegal-Summerton line
Point of interconnectionRegal-Summerton 138kV line
CountyGratiot
StateMI
Voltage138 kV
Capacity148.8 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2018-12-10
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Gratiot, MI: 25 requests in the MISO queue, 14 active totaling 1,723.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2016-AUG East (ITC)
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)GIA
Queue date2016-05-09
Interconnection agreement date2018-11-28
Operational date2018-12-10

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.