Substation Scout

MISO request J541

MISO queue ID J541

Queue request J541 was listed in the MISO interconnection queue at the end of 2025 as a 400 MW wind project in Schuyler County, MO, according to Berkeley Lab’s queue data file. The filing names Zachary-Ottumwa line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2020.

Queue IDJ541
Project nameNot reported
Status (as published)Operational
SubstationZachary-Ottumwa line
Point of interconnectionZachary-Ottumwa 345 kV line
CountySchuyler
StateMO
Voltage345 kV
Capacity400 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2020-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Schuyler, MO: 6 requests in the MISO queue, 2 active totaling 600 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2016-AUG West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)GIA
Queue date2016-01-11
Interconnection agreement date2019-08-16
Operational date2020-04-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.