Schuyler, MO interconnection queue

2 active projects totaling 600 MW in the MISO queue, plus 4 with terminal status (shown grayed).

2active projects
600active MW
6total filed
Queue IDProjectkVMWResourceStatus
J541 Not reported 345 400 Wind Operational
J682 Not reported n/r 400 Wind Withdrawn
J1177 Not reported 345 300 Wind Withdrawn
J4090 Not reported n/r 200 Solar Active
G744 Not reported 161 150 Wind Withdrawn
G448 Not reported 161 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.