MISO queue ID J538

Queue request J538 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW wind project in Hillsdale County, MI, according to Berkeley Lab’s queue data file. The filing names Moore Rd to Dowling line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2020.

Queue IDJ538
Project nameNot reported
Status (as published)Operational
SubstationMoore Rd to Dowling line
Point of interconnectionMoore Rd to Dowling 138kV line
CountyHillsdale
StateMI
Voltage138 kV
Capacity150 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2020-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hillsdale, MI: 12 requests in the MISO queue, 5 active totaling 636.1 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2016-FEB East (ITC)
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)GIA
Queue date2015-11-16
Interconnection agreement date2018-08-29
Operational date2020-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.