Hillsdale, MI interconnection queue

5 active projects totaling 636.1 MW in the MISO queue, plus 7 with terminal status (shown grayed).

5active projects
636.1active MW
12total filed
Queue IDProjectkVMWResourceStatus
G766 Not reported 138 300 Wind Withdrawn
J1658 Not reported 138 180 Solar Active
J085 Not reported 138 150 Wind Withdrawn
J3722 Not reported 138 150 Solar Active
J538 Not reported 138 150 Wind Operational
J2812 Not reported n/r 140 Solar Active
J846 Not reported 138 140 Solar Withdrawn
J056 Not reported 138 100.8 Wind Withdrawn
J1555 Not reported 138 100 Solar Withdrawn
J2119 Not reported n/r 50 Hybrid Withdrawn
J099 Not reported 138 48.6 Wind Withdrawn
J2283 Not reported n/r 16.1 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.