Substation Scout

MISO request J472

MISO queue ID J472

Queue request J472 was listed in the MISO interconnection queue at the end of 2025 as a 1,044.8 MW gas project in Montgomery County, TX, according to Berkeley Lab’s queue data file. The filing names Entergy√¢‚Ǩ‚Ñ¢s and Lewis Creek Substations as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of July 1, 2020.

Queue IDJ472
Project nameNot reported
Status (as published)Operational
SubstationEntergy’s and Lewis Creek Substations
Point of interconnectionEntergy’s 138 kV and 230kV Lewis Creek Substations
CountyMontgomery
StateTX
Voltage138 kV
Capacity1,044.8 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2020-07-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Montgomery, TX: 4 requests in the MISO queue, 2 active totaling 1,250.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2016-AUG South
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)GIA
Queue date2015-09-10
Interconnection agreement date2018-07-27
Operational date2020-07-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first