Montgomery, TX interconnection queue

2 active projects totaling 1,250.6 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
1,250.6active MW
4total filed
Queue IDProjectkVMWResourceStatus
J472 Not reported 138 1,044.8 Gas Operational
J3586 Not reported 230 205.8 Hybrid Active
J911 Not reported 230 150 Solar Withdrawn
J923 Not reported 230 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.