MISO request J4196

MISO queue ID J4196

Queue request J4196 was listed in the MISO interconnection queue at the end of 2025 as a 300 MW solar project in Phillips County, AR, according to Berkeley Lab’s queue data file. The filing names GILLETT - ELAINE as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2029.

Queue IDJ4196
Project nameNot reported
Status (as published)Active
SubstationGILLETT - ELAINE
Point of interconnectionGILLETT - ELAINE 115.0kV
CountyPhillips
StateAR
Voltage115 kV
Capacity300 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2029-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Phillips, AR: 15 requests in the MISO queue, 9 active totaling 1,390.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
ClusterDPP Cycle Pending South
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-09-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.