MISO request J4157
MISO queue ID J4157
Queue request J4157 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW wind project in Morrison County, MN, according to Berkeley Lab’s queue data file. The filing names Iron Ridge - Benton as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 2, 2030.
| Queue ID | J4157 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Iron Ridge - Benton |
| Point of interconnection | Iron Ridge - Benton 345kV |
| County | Morrison |
| State | MN |
| Voltage | 345 kV |
| Capacity | 150 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2030-09-02 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Morrison, MN: 6 requests in the MISO queue, 2 active totaling 324 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MINNESOTA POWER INC. |
|---|---|
| Cluster | DPP Cycle Pending West |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-10-03 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.