MISO request J4142
MISO queue ID J4142
Queue request J4142 was listed in the MISO interconnection queue at the end of 2025 as a 115 MW solar project in Franklin Parish, LA, according to Berkeley Lab’s queue data file. The filing names Gilbert as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 31, 2030.
| Queue ID | J4142 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Gilbert |
| Point of interconnection | Gilbert 115 kV |
| County | Franklin Parish |
| State | LA |
| Voltage | 115 kV |
| Capacity | 115 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2030-08-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Franklin Parish, LA: 7 requests in the MISO queue, 3 active totaling 355 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY LOUISIANA |
|---|---|
| Cluster | DPP Cycle Pending South |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-10-04 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.