Substation Scout

MISO request J4139

MISO queue ID J4139

Queue request J4139 was listed in the MISO interconnection queue at the end of 2025 as a 115 MW hybrid project in Nevada County, AR, according to Berkeley Lab’s queue data file. The filing names EMMET SS - HOPE EAST SS as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2030.

Queue IDJ4139
Project nameNot reported
Status (as published)Active
SubstationEMMET SS - HOPE EAST SS
Point of interconnectionEMMET SS - HOPE EAST SS 115.0kV
CountyNevada
StateAR
Voltage115 kV
Capacity115 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2030-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Nevada, AR: 6 requests in the MISO queue, 3 active totaling 865 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
ClusterDPP Cycle Pending South
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-09-25
Components (hybrid)Solar 115 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first