Nevada, AR interconnection queue
3 active projects totaling 865 MW in the MISO queue, plus 3 with terminal status (shown grayed).
3active projects
865active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J2864 | Not reported | 500 | 375 | Solar | Active |
| J2866 | Not reported | 500 | 375 | Solar | Active |
| J2240 | Not reported | n/r | 120 | Solar | Withdrawn |
| J4139 | Not reported | 115 | 115 | Hybrid | Active |
| J2638 | Not reported | 115 | 58 | Solar | Withdrawn |
| J3218 | Not reported | n/r | 50 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.