Nevada, AR interconnection queue

3 active projects totaling 865 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3active projects
865active MW
6total filed
Queue IDProjectkVMWResourceStatus
J2864 Not reported 500 375 Solar Active
J2866 Not reported 500 375 Solar Active
J2240 Not reported n/r 120 Solar Withdrawn
J4139 Not reported 115 115 Hybrid Active
J2638 Not reported 115 58 Solar Withdrawn
J3218 Not reported n/r 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.