MISO request J4112
MISO queue ID J4112
Queue request J4112 was listed in the MISO interconnection queue at the end of 2025 as a 300 MW wind project in Rock Island County, IL, according to Berkeley Lab’s queue data file. The filing names OAK GROVE - SUB 93 LOUISA as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2030.
| Queue ID | J4112 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | OAK GROVE - SUB 93 LOUISA |
| Point of interconnection | OAK GROVE - SUB 93 LOUISA 345.0kV |
| County | Rock Island |
| State | IL |
| Voltage | 345 kV |
| Capacity | 300 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2030-10-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rock Island, IL: 7 requests in the MISO queue, 5 active totaling 1,008 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MIDAMERICAN ENERGY CO. |
|---|---|
| Cluster | DPP Cycle Pending West |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-10-07 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.