MISO request J4023
MISO queue ID J4023
Queue request J4023 was listed in the MISO interconnection queue at the end of 2025 as a 185 MW solar project in Clay County, IN, according to Berkeley Lab’s queue data file. The filing names Wabash River - Staunton as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2029.
| Queue ID | J4023 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Wabash River - Staunton |
| Point of interconnection | Wabash River - Staunton 230.0kV |
| County | Clay |
| State | IN |
| Voltage | 230 kV |
| Capacity | 185 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2029-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Wabash River - Staunton substation: 2 requests in the MISO queue, 1 active totaling 185 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J3593 | Not reported | 250 | Hybrid | Withdrawn |
Clay, IN: 5 requests in the MISO queue, 1 active totaling 185 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | DUKE ENERGY INDIANA |
|---|---|
| Cluster | DPP Cycle Pending Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-02-03 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.