1 active project totaling 185 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
185active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3593 Not reported 230 250 Hybrid Withdrawn
J4023 Not reported 230 185 Solar Active
J1591 Not reported 138 150 Solar Withdrawn
J3010 Not reported 69 60 Solar Withdrawn
J224 Not reported 69 29.5 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.