MISO request J3966

MISO queue ID J3966

Queue request J3966 was listed in the MISO interconnection queue at the end of 2025 as a 480 MW wind project in Huron County, MI, according to Berkeley Lab’s queue data file. The filing names GRASSMERE as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2029.

Queue IDJ3966
Project nameNot reported
Status (as published)Active
SubstationGRASSMERE
Point of interconnectionGRASSMERE
CountyHuron
StateMI
VoltageNot reported
Capacity480 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2029-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

GRASSMERE substation: 4 requests in the MISO queue, 4 active totaling 1,280 MW.

Queue IDProjectMWResourceStatus
J4094Not reported300BatteryActive
J4095Not reported300BatteryActive
J1525Not reported200SolarActive

Huron, MI: 41 requests in the MISO queue, 29 active totaling 4,917.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-04-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.