MISO request J3962

MISO queue ID J3962

Queue request J3962 was listed in the MISO interconnection queue at the end of 2025 as a 165 MW hybrid project in Bay County, MI, according to Berkeley Lab’s queue data file. The filing names BAUER - HAMPTON 1 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2030.

Queue IDJ3962
Project nameNot reported
Status (as published)Active
SubstationBAUER - HAMPTON 1
Point of interconnectionBAUER - HAMPTON 1 345.0kV
CountyBay
StateMI
Voltage345 kV
Capacity165 MW
Resource (as published)Wind+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2030-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bay, MI: 20 requests in the MISO queue, 9 active totaling 1,174 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-03-12
Components (hybrid)Wind 165 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.