Bay, MI interconnection queue

9 active projects totaling 1,174 MW in the MISO queue, plus 11 with terminal status (shown grayed).

9active projects
1,174active MW
20total filed
Queue IDProjectkVMWResourceStatus
G872 Not reported 345 875 Coal Withdrawn
J3361 Not reported n/r 254 Wind Active
J1909 Not reported 345 200 Solar Withdrawn
J1910 Not reported 345 200 Solar Withdrawn
J2487 Not reported 345 200 Solar Withdrawn
J2933 Not reported 345 200 Solar Withdrawn
J3928 Not reported 345 200 Wind Active
J3277 Not reported n/r 175 Battery Withdrawn
J3962 Not reported 345 165 Hybrid Active
J1915 Not reported 138 150 Solar Withdrawn
J1922 Not reported 138 150 Solar Withdrawn
J1924 Not reported 138 150 Solar Withdrawn
J2488 Not reported 138 150 Solar Withdrawn
J3473 Not reported n/r 150 Solar Active
J3512 Not reported n/r 150 Battery Withdrawn
J3644 Not reported n/r 150 Solar Active
J052 Not reported 138 100 Wind Operational
J2874 Not reported n/r 85 Solar Active
J4125 Not reported n/r 50 Wind Active
J201 Not reported 138 20 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.