MISO request J396

MISO queue ID J396

Queue request J396 was listed in the MISO interconnection queue at the end of 2025 as a 1,020 MW gas project in St. Charles Parish, LA, according to Berkeley Lab’s queue data file. The filing names Entergy Little Gypsy Power Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 30, 2019.

Queue IDJ396
Project nameNot reported
Status (as published)Operational
SubstationEntergy Little Gypsy Power Station
Point of interconnectionEntergy Little Gypsy Power Station
CountySt. Charles Parish
StateLA
VoltageNot reported
Capacity1,020 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2019-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

St. Charles Parish, LA: 7 requests in the MISO queue, 4 active totaling 1,677.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2015-AUG South
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2014-09-15
Interconnection agreement date2016-12-07
Operational date2019-09-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.