MISO request J3926

MISO queue ID J3926

Queue request J3926 was listed in the MISO interconnection queue at the end of 2025 as a 170 MW wind project in Webster County, IA, according to Berkeley Lab’s queue data file. The filing names Grimes - Lehigh as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2030.

Queue IDJ3926
Project nameNot reported
Status (as published)Active
SubstationGrimes - Lehigh
Point of interconnectionGrimes - Lehigh 345kV
CountyWebster
StateIA
Voltage345 kV
Capacity170 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2030-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Grimes - Lehigh substation: 2 requests in the MISO queue, 1 active totaling 170 MW.

Queue IDProjectMWResourceStatus
R62Not reported300WindWithdrawn

Webster, IA: 8 requests in the MISO queue, 4 active totaling 820 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDAMERICAN ENERGY CO.
ClusterDPP Cycle Pending West
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-03-13

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first