MISO request J3908

MISO queue ID J3908

Queue request J3908 was listed in the MISO interconnection queue at the end of 2025 as a 196 MW solar project in St. Joseph County, MI, according to Berkeley Lab’s queue data file. The filing names BATAVIA - MORROW as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 30, 2025.

Queue IDJ3908
Project nameNot reported
Status (as published)Active
SubstationBATAVIA - MORROW
Point of interconnectionBATAVIA - MORROW 138.0kV
CountySt. Joseph
StateMI
Voltage138 kV
Capacity196 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-04-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

BATAVIA - MORROW substation: 2 requests in the MISO queue, 2 active totaling 346 MW.

Queue IDProjectMWResourceStatus
J3844Not reported150SolarActive

St. Joseph, MI: 3 requests in the MISO queue, 2 active totaling 346 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-03-10

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.