Substation Scout

St. Joseph, MI interconnection queue

2 active projects totaling 346 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
346active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3908 Not reported 138 196 Solar Active
J3844 Not reported 138 150 Solar Active
J1609 Not reported 138 125 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first