MISO request J3872
MISO queue ID J3872
Queue request J3872 was listed in the MISO interconnection queue at the end of 2025 as a 350 MW battery project in Wayne County, MI, according to Berkeley Lab’s queue data file. The filing names RIVER ROUGE as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 5, 2029.
| Queue ID | J3872 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | RIVER ROUGE |
| Point of interconnection | RIVER ROUGE |
| County | Wayne |
| State | MI |
| Voltage | Not reported |
| Capacity | 350 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2029-01-05 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Wayne, MI: 23 requests in the MISO queue, 12 active totaling 2,589.5 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ITC |
|---|---|
| Cluster | DPP Cycle Pending East (ITC) |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-01-27 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.