Substation Scout

MISO request J3872

MISO queue ID J3872

Queue request J3872 was listed in the MISO interconnection queue at the end of 2025 as a 350 MW battery project in Wayne County, MI, according to Berkeley Lab’s queue data file. The filing names RIVER ROUGE as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 5, 2029.

Queue IDJ3872
Project nameNot reported
Status (as published)Active
SubstationRIVER ROUGE
Point of interconnectionRIVER ROUGE
CountyWayne
StateMI
VoltageNot reported
Capacity350 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-01-05
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wayne, MI: 23 requests in the MISO queue, 12 active totaling 2,589.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-01-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first