MISO request J3866
MISO queue ID J3866
Queue request J3866 was listed in the MISO interconnection queue at the end of 2025 as a 300 MW wind project in Lapeer County, MI, according to Berkeley Lab’s queue data file. The filing names BENNET - GREENWOOD as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 1, 2028.
| Queue ID | J3866 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | BENNET - GREENWOOD |
| Point of interconnection | BENNET - GREENWOOD 120.0kV |
| County | Lapeer |
| State | MI |
| Voltage | 120 kV |
| Capacity | 300 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2028-11-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Lapeer, MI: 8 requests in the MISO queue, 3 active totaling 600 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ITC |
|---|---|
| Cluster | DPP Cycle Pending East (ITC) |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2024-12-06 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.