Substation Scout

Lapeer, MI interconnection queue

3 active projects totaling 600 MW in the MISO queue, plus 5 with terminal status (shown grayed).

3active projects
600active MW
8total filed
Queue IDProjectkVMWResourceStatus
J3866 Not reported 120 300 Wind Active
J1661 Not reported 120 200 Solar Withdrawn
J3472 Not reported n/r 200 Solar Active
J3876 Not reported n/r 150 Solar Withdrawn
J3828 Not reported n/r 100 Solar Active
J601 Not reported 120 100 Wind Withdrawn
J839 Not reported 120 100 Solar Withdrawn
J3875 Not reported n/r 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.