Lapeer, MI interconnection queue
3 active projects
totaling 600 MW in the MISO queue, plus 5 with terminal status (shown grayed).
3 active projects
600 active MW
8 total filed
Queue ID Project kV MW Resource Status
J3866
Not reported
120
300
Wind
Active
J1661
Not reported
120
200
Solar
Withdrawn
J3472
Not reported
n/r
200
Solar
Active
J3876
Not reported
n/r
150
Solar
Withdrawn
J3828
Not reported
n/r
100
Solar
Active
J601
Not reported
120
100
Wind
Withdrawn
J839
Not reported
120
100
Solar
Withdrawn
J3875
Not reported
n/r
50
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.