MISO request J3815
MISO queue ID J3815
Queue request J3815 was listed in the MISO interconnection queue at the end of 2025 as a 153.1 MW nuclear project in St. Charles Parish, LA, according to Berkeley Lab’s queue data file. The filing names Waterford 3 SWYD as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 22, 2026.
| Queue ID | J3815 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Waterford 3 SWYD |
| Point of interconnection | Waterford 3 SWYD |
| County | St. Charles Parish |
| State | LA |
| Voltage | Not reported |
| Capacity | 153.1 MW |
| Resource (as published) | Nuclear |
| Resource category | Nuclear (normalized for filtering) |
| Proposed online date | 2026-10-22 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
St. Charles Parish, LA: 7 requests in the MISO queue, 4 active totaling 1,677.3 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY LOUISIANA |
|---|---|
| Cluster | DPP-2023 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Study Phase: DPP 1 |
| Queue date | 2024-06-29 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.