MISO request J374

MISO queue ID J374

Queue request J374 was listed in the MISO interconnection queue at the end of 2025 as a 30 MW project in Bucks County, PA, according to Berkeley Lab’s queue data file. The filing names Fairless Hills Power Plant as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 17, 2014.

Queue IDJ374
Project nameNot reported
Status (as published)Operational
SubstationFairless Hills Power Plant
Point of interconnectionFairless Hills Power Plant
CountyBucks
StatePA
VoltageNot reported
Capacity30 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2014-11-17
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bucks, PA: 1 request in the MISO queue, 1 active totaling 30 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2014-AUG Central
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2014-07-03
Interconnection agreement date2016-02-26
Operational date2014-11-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.