Bucks, PA interconnection queue

1 active project totaling 30 MW in the MISO queue.

1active projects
30active MW
1total filed
Queue IDProjectkVMWResourceStatus
J374 Not reported n/r 30 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.