Queue request J3730 was listed in the MISO interconnection queue at the end of 2025 as a 444 MW wind project in Macoupin County, IL, according to Berkeley Lab’s queue data file. The filing names MORO Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 1, 2028.

Queue IDJ3730
Project nameNot reported
Status (as published)Active
SubstationMORO Substation
Point of interconnectionMORO 345 kV Substation
CountyMacoupin
StateIL
Voltage345 kV
Capacity444 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Macoupin, IL: 4 requests in the MISO queue, 2 active totaling 1,036.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2023 Central
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first