Substation Scout

Macoupin, IL interconnection queue

2 active projects totaling 1,036.8 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
1,036.8active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1464 Not reported 345 592.8 Solar Operational
J3730 Not reported 345 444 Wind Active
J1408 Not reported 138 100 Hybrid Withdrawn
J3372 Not reported n/r 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.