Substation Scout

MISO request J373

MISO queue ID J373

Queue request J373 was listed in the MISO interconnection queue at the end of 2025 as a 71.5 MW gas project in St. Mary Parish, LA, according to Berkeley Lab’s queue data file. The filing names Near Morgan City Substation on side as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 31, 2016.

Queue IDJ373
Project nameNot reported
Status (as published)Operational
SubstationNear Morgan City Substation on side
Point of interconnectionNear Morgan City Substation on 138 kV side
CountySt. Mary Parish
StateLA
Voltage138 kV
Capacity71.5 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2016-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

St. Mary Parish, LA: 9 requests in the MISO queue, 3 active totaling 183.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2014-AUG South
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2014-06-30
Interconnection agreement date2016-02-26
Operational date2016-03-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.