St. Mary Parish, LA interconnection queue

3 active projects totaling 183.5 MW in the MISO queue, plus 6 with terminal status (shown grayed).

3active projects
183.5active MW
9total filed
Queue IDProjectkVMWResourceStatus
J1455 Not reported 138 150 Solar Withdrawn
J1788 Not reported 230 120 Solar Withdrawn
J2191 Not reported 230 100 Solar Withdrawn
J1367 Not reported 230 95 Solar Active
J373 Not reported 138 71.5 Gas Operational
J699 Not reported n/r 48.3 Wind Withdrawn
J465 Not reported 138 44.1 Other Withdrawn
J323 Not reported n/r 19.8 Wind Withdrawn
J1247 Not reported 138 17 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first