MISO request J3702

MISO queue ID J3702

Queue request J3702 was listed in the MISO interconnection queue at the end of 2025 as a 180 MW wind project in Mitchell County, IA, according to Berkeley Lab’s queue data file. The filing names ADAMS as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2028.

Queue IDJ3702
Project nameNot reported
Status (as published)Active
SubstationADAMS
Point of interconnectionADAMS
CountyMitchell
StateIA
VoltageNot reported
Capacity180 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

ADAMS substation: 2 requests in the MISO queue, 2 active totaling 680 MW.

Queue IDProjectMWResourceStatus
J4078Not reported500BatteryActive

Mitchell, IA: 9 requests in the MISO queue, 3 active totaling 584 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNORTHERN STATES POWER COMPANY
ClusterDPP-2023 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-03-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.