Mitchell, IA interconnection queue

3 active projects totaling 584 MW in the MISO queue, plus 6 with terminal status (shown grayed).

3active projects
584active MW
9total filed
Queue IDProjectkVMWResourceStatus
G964 Not reported n/r 300 Wind Withdrawn
G965 Not reported n/r 300 Wind Withdrawn
J448 Not reported 161 202 Wind Withdrawn
J449 Not reported n/r 202 Wind Operational
S1093 Surplus; J449 n/r 202 Battery Active
G963 Not reported n/r 200 Wind Withdrawn
J3702 Not reported n/r 180 Wind Active
G962 Not reported n/r 100 Wind Withdrawn
G643 Not reported 69 20 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.