MISO request J3525
MISO queue ID J3525
Queue request J3525 was listed in the MISO interconnection queue at the end of 2025 as a 300 MW battery project in Rock Island County, IL, according to Berkeley Lab’s queue data file. The filing names SUB 47 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 6, 2028.
| Queue ID | J3525 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | SUB 47 |
| Point of interconnection | SUB 47 |
| County | Rock Island |
| State | IL |
| Voltage | Not reported |
| Capacity | 300 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2028-09-06 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rock Island, IL: 7 requests in the MISO queue, 5 active totaling 1,008 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MIDAMERICAN ENERGY CO. |
|---|---|
| Cluster | DPP-2023 West |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Study Phase: DPP 1 |
| Queue date | 2024-04-17 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.