MISO request J3382

MISO queue ID J3382

Queue request J3382 was listed in the MISO interconnection queue at the end of 2025 as a 171 MW solar project in Piatt County, IL, according to Berkeley Lab’s queue data file. The filing names 4WEEDMAN - 4MAHOMET 1 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2028.

Queue IDJ3382
Project nameNot reported
Status (as published)Active
Substation4WEEDMAN - 4MAHOMET 1
Point of interconnection4WEEDMAN - 4MAHOMET 1 138.0kV
CountyPiatt
StateIL
Voltage138 kV
Capacity171 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

4WEEDMAN - 4MAHOMET 1 substation: 2 requests in the MISO queue, 1 active totaling 171 MW.

Queue IDProjectMWResourceStatus
J3520Not reported215SolarWithdrawn

Piatt, IL: 6 requests in the MISO queue, 2 active totaling 471 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2023 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-04-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.